Last week, at the 3rd Regional Health Authority of Macedonia’s event at Papageorgiou Hospital, Renel presented the progress of major upgrades carried out in two hospitals.
✅ Papageorgiou Hospital – The HVAC system, fire detection & emergency lighting upgrade project is 99% complete, ensuring improved comfort conditions, reduced energy consumption & enhanced safety for patients and medical staff.
✅ Katerini Hospital – The expansion of the pathology clinic is at 22% completion, adding valuable patient care space and strengthening the hospital’s capacity to serve more people with modern infrastructure.
The presentation was delivered by Renel’s Project Manager, Konstantinos Mallas, who highlighted the significance of these projects in improving healthcare services, optimizing energy efficiency & enhancing hospital sustainability.
At Renel Energy & Power Engineering, we are committed to creating resilient, efficient & sustainable infrastructure for the future of healthcare.